Depuration by filters using total oxidation

 

Depuration unit by total oxidation with recirculation of  mud manufactured in Polyester reinforce with glass fiber, compact, cylindrical, horizontal, suitable to bury.

 

 

FUNCTIONING

 

The depuifying plant of total oxydation join three fundamental process:

 

1. A process of  a long aeration
2. A process  of nitrification – des nitrification
3.  A process of separation –water clarification by mud cloak in suspension

 

 

These process get together in two compartments:


 1. The  effluent gets in the first compartment where the activation and nitrification  zone are, where the organic material is reduce with the aerobic process by the introduction of air  through diffusers, changing in carbon dioxide, water and new microorganisms. The aeration allows a correct oxygenation of the germs  creating an advantage for the active mud.

 

2. The liquid goes to the second compartment, to the desnitrification and clarification zones. All these is used by the organic material as a  source of carbon for the desnitrification. This compartment  produce a mollification of the effluent  that gives a mud sedimentation.

 

Purifying plant efficiency: DBO5: 95% - M. E. S.: 95%

 

 

INSTALATION

 

Previous to the purifying plant  we install a treatment of smoothing so we can divide the  residual water from the thick solid particles and so on we prevent the entry of elements that can damage the purifying plant.

 

We do the excavation as we measure the equipment and the gap of maneuverability of 50 cm. It´s very important that the land do not have any  prominent contact of rock or any kind of pricking material.

 

In the lower part of the excavation we built a paving-stone reinforced concrete with a minimum thickness of 15 cm and 175 Kg/cm2 of resistance.  When the concrete is set, we have to pour out another concrete with 100kg/cm2 of resistance and a high of 30 cm from the floor and all around the pit. While the concrete still melting, we put the tank in the right level.

 

When it´s dried, place the sand without any thick material all around the tank and at the same time, fill the tank until a 75% of it´s total capacity. It´s important to compact the sand when you place it so you avoid air holes.

 

For the underground tanks is required to place a chest in the man entrances where there will not be any recline over the tank

 

It´s a must that there were  any underground water that drag the compact sand to avoid potential fissure in the tank.


 

 

 

DESIGN

 

The purifiyng plant are calculate attending a volume of 250 to 300 liter/people/day and a time of retention of 24 hours, higher parameters then the ones in the existing market.

 

 

SUPPLY MATERIAL

 

Compact purifiyng plant built in PRFV, recirculation bomb, air diffusors of fine bubbles and accessories in interior PVC ,  blowing limit valve and filter, electric square with temporizers of the bomb and blowing and the grid of standard measures smooth down.


The use of a biological activator is recommend when it´s going to be execute or when has been a while since you don´t use it to increase it´s efficiency from the first days.

 

 

 

Nº People Capacty (liters) Long (meters) Diameter (meters) Tub Diameter (mm)
5
2500
2.100
0.900
110
10
5200
2.500
1.300
110
15
6500
2.700
1.400
110
20
9000
2.300
1.500
110
25
10500
3.000
1.600
125
30
12500
3.500
1.700
160
50
19000
4.200
1.900
160
75
25500
6.100
2.300
200
100
32000
6.500
2.500
200

 

Up ^